BMH Academy — training and professional development for plant metallurgists
Practical courses for metallurgists, supervisors and operators. Taught by BMH engineers with 15 to 30 years of experience: theory, real case reviews and hands-on practice on the process. We adapt the programme to your plant’s ore and flowsheet; it ends with an assessment and an official certificate.
Training areas
- 1. Mineral processing fundamentals — Foundation level for metallurgists and supervisors
- 2. Process technology and flotation — In depth: new methods, Cu-Mo flotation, separation
- 3. Laboratory testwork — Bond work index, SAG mill tests, flotation tests
- 4. Analytics and modelling — Excel, mass balances, JKSimMet, JKSimFloat
- 5. Management and optimisation — Flowsheet, process, mine-to-mill interaction
- 6. Belt scales — Accounting technology and Thermo Fisher (Ramsey) equipment
- 7. Sampling and balance — GOST and ISO sampling standards, Cu and Mo concentrates, AMIRA P754 balance
1. Mineral processing fundamentals
Foundation level
Mineral processing technology
A systematic foundation for metallurgists: from ore preparation and separation theory to process modelling, control and automation.
Programme by hours
| Subject | Hours |
|---|---|
| Day 1 | |
| Crushing, grinding and ore preparation for beneficiation | 2,5 |
| Theory of mineral separation | 1 |
| Flotation of minerals | 2,5 |
| Chemistry and technology of flotation reagents | 1,5 |
| Mineral processing technology | 1 |
| Process mineralogy | 1 |
| Mineral resource management | 0,5 |
| Process evaluation of mineral feedstock | 0,5 |
| Day 2 | |
| Systems analysis in mineral processing | 2 |
| Modelling of separation mass-transfer processes | 2 |
| Process control | 1 |
| Modelling and automation of mineral processing | 1 |
| Exam, certificate presentation | 1,5 |
2. Process technology and flotation
New technologies
New ore processing technologies and methods
What leading plants around the world use and how to bring it to yours: new processing methods, higher recovery and concentrate grade, ore evaluation and metal balance.
Programme by hours
| Subject | Hours |
|---|---|
| Day 1 | |
| New technologies used at concentrators abroad | 2–3 |
| New ore processing methods at operating plants: higher recovery and concentrate grade | 2–4 |
| Crushing, grinding and ore preparation for beneficiation | 2 |
| Day 2 | |
| Theory of mineral separation | 1,5 |
| Flotation of minerals | 1,5 |
| Chemistry and technology of flotation reagents | 2 |
| Ore mineralogy: primary and secondary minerals | 1,5 |
| Day 3 | |
| Rules for preparing mineral feedstock for beneficiation | 4 |
| Process evaluation of mineral feedstock | 2 |
| Commodity balance and metal balance discrepancy | 0,5 |
| Modelling and automation of mineral processing | 1 |
| Exam, certificate presentation | 2 |
Advanced course
Flotation of copper-molybdenum ores: bulk circuit and separation
Best practice in running Cu-Mo plants: the current state of plants worldwide, ways to improve and processing specifics based on the mineralogy of your deposit.
Programme by day
Day 1. Ore and ore preparation
- Benchmark of Cu-Mo plants worldwide and specific cases.
- Overview of Cu-Mo ore processing with respect to ore morphology.
- Mineralogy and specifics of ore preparation for flotation.
- Effect of grind size, flotation feed density and mineral dissemination on the result.
Day 2. Bulk flotation
- Overview of bulk copper-molybdenum flotation.
- Paths to maximum performance: innovative approaches to ore preparation and accounting for feed mineralogy.
- Dealing with pyrite and siliceous gangue minerals.
- Photo and video review of froth at different ore mineralogy.
- Practice: operational control of bulk flotation cleaner circuits.
Day 3. Cu-Mo separation
- Ways to intensify separation for maximum recovery.
- Ionic composition and pulp potential during separation.
Separation reagents · 2 hours
- Sodium hydrosulphide (NaHS), sodium sulphide (Na2S), ammonium sulphide and hydrosulphide: mechanism of copper depression, dosage and addition points.
- Steaming of bulk concentrate: when it is needed and how it affects separation.
- Effect of pH and redox potential on copper-molybdenum separation.
- Separation control on shift: what to measure and how to adjust reagent dosage.
- Practice: operational control of separation cleaner circuits.
- Adapting research reports to plant conditions.
- Cases of interaction between operations staff and the metallurgical laboratory.
3. Laboratory testwork
Comminution
Grindability tests: Bond work index and SAG mill tests
How to obtain reliable data for mill sizing and energy calculations and apply it correctly at the plant.
What we cover
- Sample preparation and representativeness for testing.
- Bond Ball Mill Work Index and related tests.
- SAG mill tests: JK Drop Weight Test, SAG Design Test.
- Calculation of crushing and grinding energy indices, mill throughput estimation.
- Interpreting results and transferring them to operating plant conditions.
Flotation in the laboratory
Flotation testwork: from laboratory test to plant regime
How to run flotation tests so the results work at the plant, not just in the report.
What we cover
- Planning a test series: reagent schemes, grind size, pH, pulp density.
- Laboratory flotation in a JK Batch Flotation Cell, flotation kinetics.
- Bubble size and aeration: working with the AP Bubble Sizer.
- Review of froth photos and videos at different mineralogy.
- Evaluating test data: test repeatability, product balance, rejecting erroneous results.
- Correct construction of beneficiation curves: recovery–grade, kinetic curves, regime comparison.
- Testwork reporting and transfer of results into the process operating manual.
4. Data analytics and modelling
Plant data
Process data analytics in Excel and specialised software
We learn to turn shift, sample and assay data into conclusions: where metal is lost, what drives recovery and how to prove it with numbers.
What we cover
- Data collection and cleaning: shifts, samples, assays, reagent consumption.
- Metallurgical balance and discrepancy in Excel: templates, checks, management reports.
- Grade-and-quantity flowsheets with mass and water balance.
- Finding relationships: grind size, density, reagents, mineralogy versus recovery and grade.
- Modelling comminution and flotation in JKSimMet and JKSimFloat (JKTech) and other specialised software.
- Regular process reporting: daily, monthly, annual.
5. Plant management and optimisation
For chief metallurgists and managers
Plant optimisation: flowsheet, process control, comminution
We start by assessing operations staff competence and build a plan of training sessions from the results, so the team understands the flowsheet and processes more broadly, sees all the factors and makes the right decisions quickly.
Programme by hours
| Subject | Hours |
|---|---|
| Flowsheet analysis, identifying problem areas | 1 |
| Improvement areas with detailed modelling to confirm the benefits | 0,5 |
| Metallurgical accounting, energy efficiency calculation, operating cost reduction | 1,5 |
| Process control philosophy, operating strategy | 1 |
| Mine-to-mill interaction | 1 |
| Standards for safe and efficient operation of major equipment | 1,5 |
| Comminution circuits for grinding critical size material | 1 |
| Modelling grinding in SAG and ball mills with different liner profiles | 1 |
| Flotation optimisation for difficult ores | 1 |
| Exam, certificate presentation | 0,5 |
6. Belt scales
A separate area in two parts: accounting technology for metallurgists and metrologists, and equipment for instrumentation, mechanical and metrology teams who maintain the scales.
Part 1 · Accounting technology
Belt scales: accounting accuracy and calibration
Belt scales are the plant’s cash register: they account for feed, products and the metallurgical balance. The course shows where the error comes from and how to keep it under control.
Programme
- Scale design: weighing section, load cells, speed sensor, integrator.
- Sources of error: belt tension, idlers, build-up, alignment, speed.
- Verification methods: material, static weights, calibration chain CHAINCAL-9000.
- Weighing section maintenance and inspection schedule.
- What error costs: calculating unaccounted metal and calibration payback.
- Practice: calibration, factor correction, test report.
Part 2 · Equipment
Thermo Fisher Scientific (Ramsey) belt scales and weigh feeders: design, installation, set-up, calibration
A practical course for those who install, set up and maintain weighing equipment: from load cell and speed sensor to the Micro-Tech MT9101 controller, including troubleshooting.
Programme by hours
| Seminar | Hours |
|---|---|
| Overview of in-motion weighing equipment for bulk materials. Design and operation of the components: weighing device, primary and secondary transducers, indicators, terminals and controllers. Data transfer from load cell to indicator and controller: discrete and analogue signals. Safety during repair, maintenance and storage | 4 |
| Weigh belt feeders | 5 |
| Belt scale model range: which system to use where | 5 |
| Choosing the installation location and mounting. Component installation specifics, set-up of indicators, terminals and controllers with built-in and external software, set-up and maintenance of the Micro-Tech MT9101, operation and troubleshooting, including the mechanical side | 4 + 2 practice |
| Belt scale calibration methods. Set-up and calibration of indicators and controllers, Micro-Tech MT9101, troubleshooting | 4 + 4 practice |
| Advantages of Thermo Fisher Scientific (Ramsey) belt scales | 4 |
| Speed sensor: how to select and install it correctly | 2 + 2 practice |
| Exam, certificate presentation | 1 |
7. Representative sampling for balance accounting
The metallurgical balance and settlements with the concentrate buyer start with the sample. If the sample is not representative, neither the laboratory nor the reporting can fix the error.
Regulatory framework
Sampling and sample preparation standards: what applies to each metal
This module is part of the courses in this area: we cover which standard applies to your product, how national GOST standards differ from ISO and how this affects the balance and settlements with the buyer.
| Ores and products | GOST | International |
|---|---|---|
| Copper, lead, zinc, nickel, molybdenum and other non-ferrous metals: ores and concentrates | GOST 14180-80: sampling and sample preparation for chemical analysis and moisture determination | ISO 12743: copper, lead, zinc and nickel concentrates, sampling for metal and moisture |
| Iron ores, concentrates, sinter, pellets | GOST 15054-80 (chemical analysis and moisture), GOST 17495-80 (size distribution), GOST 26136-84 (physical tests) | ISO standards for iron ores |
| Manganese ores, concentrates, sinter | GOST 16598-80 (chemical analysis and moisture), GOST 25498-82 (size distribution) | — |
| Chromium ores and concentrates | Company procedures | ISO 6153, ISO 6154 |
| Gold and other precious metals in ores and products | GOST 14180 does not cover precious metals: we review industry procedures | Pierre Gy’s sampling theory, calculating sample mass for coarse gold |
Copper and molybdenum concentrates · GOST 14180
Sampling procedures for copper and molybdenum concentrates. Sample preparation for moisture content and chemical analysis. Purpose, content and practical application of GOST 14180
How to sample and prepare concentrate samples so that moisture and metal grades in the report match reality and the results stand up to reconciliation with the buyer.
Standard programme: 2 days, by hours
| Subject | Hours |
|---|---|
| Content and application of GOST 14180. Practice for different sampling conditions | 1,5 |
| Establishing the sampling scheme | 1,5 |
| Increment mass | 1 |
| Sampling methods for moving streams | 1 |
| Manual sampling from a stream | 1,5 |
| Stopped-belt sampling | 1,5 |
| Grab samples | 1,5 |
| Sampling from trucks and rail wagons | 1,5 |
| Sampling from bags and drums | 1 |
| Sampling from stockpiles | 1 |
| Methods of sample crushing, mixing and division | 1,5 |
| Sample requirements: moisture, chemical analysis, physical property tests, sample mass | 1,5 |
| Total | 16 |
Extended programme: 3 days — the standard programme plus a day on international practice
| Subject | Hours |
|---|---|
| Days 1–2 | 16 |
| The full standard programme | 16 |
| Day 3 | 9,5 |
| International ISO and ASTM sampling standards | 0,5 |
| Key differences between GOST 14180 and ISO/ASTM for copper and molybdenum concentrates | 0,5 |
| International examples of sampling from big bags, drums, bulk piles, gondola cars and dump cars; metallurgical accounting nuances | 1 |
| Theory of dry material (ore, concentrate) sampling from conveyors | 1 |
| Theory of slurry (tailings, concentrate) sampling from pipes and launders | 1 |
| Selecting equipment for dry material sampling | 1 |
| Selecting equipment for slurry sampling | 1 |
| Accounting system: sampler + density gauge + flow meter = metal accounting in t/h | 1 |
| On-stream analysers: theory, calculations, installation points, effect on the metallurgical balance | 1 |
| Plant trial plan for dry material and slurry sampling systems | 0,5 |
| Practice to reinforce the theory | 0,5 |
| Test | 0,5 |
Metallurgical accounting
Plant metallurgical balance under the AMIRA P754 Code
How to build metal accounting to international practice: from measurement points to a report trusted by management, auditors and concentrate buyers.
What we cover
- AMIRA P754 Code principles: accountability, transparency, accuracy of metal accounting.
- Accounting points and measurement requirements: scales, sampling, density gauges, flow meters, analysers.
- Balance reconciliation, discrepancy and its acceptable limits.
- Accounting for in-circuit inventory and work in progress.
- Shift, daily and monthly reporting; audit of the accounting system.
- Practice: checking your plant’s balance and an improvement plan.
How to choose a course
| Who is training or what is the task | We recommend | Package |
|---|---|---|
| Junior metallurgists, supervisors, operators | 1. Mineral processing fundamentals | Standard |
| Experienced metallurgists who need to raise recovery and grade | 2. New technologies; Flotation of Cu-Mo ores | Standard or extended |
| Laboratory, design, mill sizing | 3. Grindability tests; Flotation testwork | Extended |
| Process engineers, accounting and reporting | 4. Data analytics and modelling | Extended |
| Chief metallurgists and plant managers | 5. Plant optimisation | Standard or extended |
| Metrologists, feed and product accounting | 6. Belt scales, part 1: accounting technology | Standard |
| Samplers, QC, laboratory, concentrate accounting | 7. Sampling: procedures for Cu and Mo concentrates, GOST 14180 and ISO | Standard or extended |
| Metallurgists and accounting who need a transparent metal balance | 7. Metallurgical balance under AMIRA P754 | Extended |
| Instrumentation and mechanical teams maintaining the scales | 6. Belt scales, part 2: Thermo Fisher (Ramsey) equipment | Standard |
Training packages
Any course can be ordered in one of two packages. We price it based on the programme, the number of groups and the venue.
Standard
- Training to an approved programme.
- A lecture course, e.g. “Best practice in running the process for copper-molybdenum ores”.
- Handouts.
- Study guides.
- Assessment and certificates.
Extended
- Crushing and grinding energy indices: Bond work index, Drop Weight Test, SAG Design Test.
- Grade-and-quantity flowsheets with mass and water balance.
- Testwork reports and process operating manuals.
- Modelling in JKSimMet and JKSimFloat (JKTech).
- Working with the JK Drop Weight Tester, JK Batch Flotation Cell, AP Bubble Sizer.
- Flotation video examples: the effect of different factors.
What is included
- Lectures and presentations.
- Handouts and study guides.
- Interactive examples from CIS and global plants.
- Flotation video materials.
- Classroom with presentation equipment, coffee breaks every 50 minutes, lunch.
- Assessment and official certificates.
Formats
- At your plant, in a classroom or online.
- Online: lectures and data reviews remotely, practice at the plant.
- Practice in every course: laboratory, live process, calculations on your plant’s data.
- Groups of up to 12.
- The programme is built from modules to fit the team’s tasks.
- Can be combined with the subscription BMH 365: knowledge is reinforced on real plant tasks.
Shall we discuss a programme for your team?
Tell us who needs training and in what — we will propose a programme, timing and format.
Email: sales@bmhsolutions.kz
Phone: +7 702 245 00 32
